We documented and bagged all the bolts, screws, clips and other usable parts.
To get the car back up and running, the following work is needed:
- Jig & Frame Alignment Work
- Replacement N/S Chassis Leg
- Replacement N/S front driveshaft
- Replacement Clutch Slave Cylinder
- New engine wiring loom
- Replacement of all electronic parts on the N/S
- Replacement Radiator Hoses
- Replacement Thermostat housing
- Replacement A/C pipe
- Repalcement Cooling Fan
- Replacement Radiator
- Replacement Condenser
- Replacement Engine Manifold
- Replacement Front Panel
- Replacement Cross Member
- Replacement Bodywork (RS body panels)
Here are some pics of the front parts being removed for damage assessment:
No comments:
Post a Comment